Production readiness checklist

Status: release candidate checklist for adaptation.

Related chapter: 23.

Owner: platform owner or release owner.

Use case: final readiness review before an agentic capability moves beyond a limited internal pilot or controlled canary.

Version: v1.0-book-rc, to be locked when the public companion URL and first book release version are finalized.

What to adapt: organization-specific risk tiers, reviewer roles, evidence retention rules, incident channels, rollout waves and compliance gates.

Limitations: this checklist is an engineering readiness aid. It does not guarantee safety, regulatory compliance or operational approval without local review.

Minimum gates

  • Capability contract is approved.
  • Owner map is current.
  • Risk tier is assigned.
  • Policy bundle is versioned.
  • Tool gateway enforces side-effect boundaries.
  • Verifier has pre-call and post-call checks where needed.
  • Trace includes run, session, capability, policy and tool evidence.
  • Eval gate has current pass/fail rationale.
  • Rollout wave has blast-radius limits.
  • Stop criteria are explicit.
  • Rollback or reconciliation path is tested.
  • Incident channel is known.
  • Registry lifecycle state is current.
  • Open high-severity findings are closed or explicitly accepted.
  • Next assurance review date is set.